Site Assessment Guide
0 views
5 min read
Site Assessment Guide
How we evaluate your property for Offgrid deployment.
What We Assess
Physical Characteristics
- Lot size and shape: Minimum requirements vary by product
- Topography: Slope, drainage, flood zones
- Access: Road width, delivery clearance
- Utilities: Existing connections or off-grid requirements
- Soil conditions: Foundation requirements
Regulatory Factors
- Zoning designation: Residential, agricultural, mixed-use
- ADU eligibility: State and local rules
- Setbacks: Required distances from property lines
- Height limits: Maximum structure height
- HOA restrictions: Community rules and CCRs
Environmental Considerations
- Solar exposure: Shading analysis for SolarArk
- Wind patterns: For ventilation and structure
- Humidity levels: For HydroArk performance
- Vegetation: Trees, protected species
Assessment Process
Step 1: Remote Analysis
- Address lookup in ReadyPermit.AI
- Satellite imagery review
- GIS data analysis
- Preliminary buildability score
Step 2: Documentation Review
- Property deed and survey
- Existing permits
- Utility records
- HOA documents (if applicable)
Step 3: Site Visit (if needed)
- Physical measurements
- Photo documentation
- Neighbor considerations
- Access verification
Timeline
- Remote assessment: 24-48 hours
- Full assessment: 5-7 business days
- Report delivery: Within 10 days
Cost
- Basic (remote only): Free with ReadyPermit.AI subscription
- Comprehensive: $500-$1,500 depending on location
Need more help?
Ask Axiom for personalized assistance