Site Assessment Guide

0 views
5 min read

Site Assessment Guide

How we evaluate your property for Offgrid deployment.

What We Assess

Physical Characteristics

  • Lot size and shape: Minimum requirements vary by product
  • Topography: Slope, drainage, flood zones
  • Access: Road width, delivery clearance
  • Utilities: Existing connections or off-grid requirements
  • Soil conditions: Foundation requirements

Regulatory Factors

  • Zoning designation: Residential, agricultural, mixed-use
  • ADU eligibility: State and local rules
  • Setbacks: Required distances from property lines
  • Height limits: Maximum structure height
  • HOA restrictions: Community rules and CCRs

Environmental Considerations

  • Solar exposure: Shading analysis for SolarArk
  • Wind patterns: For ventilation and structure
  • Humidity levels: For HydroArk performance
  • Vegetation: Trees, protected species

Assessment Process

Step 1: Remote Analysis

  • Address lookup in ReadyPermit.AI
  • Satellite imagery review
  • GIS data analysis
  • Preliminary buildability score

Step 2: Documentation Review

  • Property deed and survey
  • Existing permits
  • Utility records
  • HOA documents (if applicable)

Step 3: Site Visit (if needed)

  • Physical measurements
  • Photo documentation
  • Neighbor considerations
  • Access verification

Timeline

  • Remote assessment: 24-48 hours
  • Full assessment: 5-7 business days
  • Report delivery: Within 10 days

Cost

  • Basic (remote only): Free with ReadyPermit.AI subscription
  • Comprehensive: $500-$1,500 depending on location

Start Your Assessment