Installation Day Guide

0 views
5 min read

Installation Day Guide

What to expect when your Mod.Home arrives.

Before Delivery Day

1 Week Before

  • [ ] Confirm delivery date and time window
  • [ ] Verify foundation is complete and inspected
  • [ ] Ensure utility stubs are in place
  • [ ] Clear delivery path of obstacles
  • [ ] Notify neighbors of crane activity

Day Before

  • [ ] Final site walkthrough
  • [ ] Mark any underground utilities
  • [ ] Prepare parking for crew vehicles
  • [ ] Have permit and approval documents ready

Delivery Day Timeline

Early Morning (6-8 AM)

  • Delivery truck arrives
  • Crane setup begins
  • Safety perimeter established

Mid-Morning (8-10 AM)

  • Unit offloaded from truck
  • Crane lifts unit into position
  • Initial placement on foundation

Late Morning (10 AM-12 PM)

  • Fine positioning adjustments
  • Level verification
  • Anchor bolt connections

Afternoon (12-5 PM)

  • Utility connections begin
  • Electrical hookup
  • Plumbing connections
  • HVAC commissioning

What You Need to Provide

  • Access: Clear path minimum 14 feet wide
  • Foundation: Complete and inspected
  • Utilities: Stubbed to connection points
  • Permits: Posted and accessible
  • Contact: Be available by phone all day

What We Handle

  • Crane and rigging
  • Professional installation crew
  • All connections and commissioning
  • Cleanup and debris removal
  • Final walkthrough with you

After Installation

Same Day

  • Walkthrough and orientation
  • System demonstrations
  • Key handover
  • Emergency contact info

Within 1 Week

  • Final inspection scheduling
  • Punch list completion
  • OffgridOS activation
  • Warranty registration

Schedule Your Installation

Axiom AI assistant - get personalized answers about this article and related sustainable infrastructure topics

Need more help?

Ask Axiom for personalized assistance

Was this article helpful?

Axiom avatar
Chat with Axiom
K